CAMTOP 7 1/16″ 5M WP Double Ram BOP — API SPEC 16A dual ram blowout preventer. 5,000 psi working pressure, NACE MR-0175 compliant. Cameron U-type design with upper pipe ram (2-3/8″ to 5-1/2″) and lower blind ram. Four 2-1/16″ 5M studded side outlets.
7 1/16″ 5M WP Double Ram BOP | API 16A | 5,000 PSI | CAMTOP
Description
7 1/16″ 5M WP Double Ram BOP 双闸板防喷器
API SPEC 16A | 7 1/16″ Bore | 5,000 PSI Working Pressure | NACE MR-0175
Product Overview
The 7 1/16″ 5M WP Double Ram BOP is a high-performance double ram blowout preventer designed and manufactured to API SPEC 16A standards. With a 7 1/16-inch bore and 5,000 psi working pressure rating, it accommodates both pipe rams and blind rams in separate cavities for comprehensive well control. The Cameron U-type design features API standardized flanged connections, nickel-based alloy 625 ring grooves, and four 2 1/16″ 5M studded side outlets for choke and kill line integration.
Bore: 7 1/16″ | Working Pressure: 5,000 psi | Test Pressure: 7,500 psi | Weight: 6,746 lb (3,060 kg) | Standard: API SPEC 16A / NACE MR-0175
Product Image

CAMTOP 7 1/16″ 5M WP Double Ram BOP — Cameron U-type design with complete ram assemblies
Assembly Drawing

CAMTOP 7 1/16″ 5M WP Double Ram BOP General Assembly Drawing — For reference only
Key Features
- API SPEC 16A Compliant: Designed and manufactured to international standards for ram blowout preventers with full design verification
- 5,000 PSI Working Pressure: Rated for 5,000 psi with 7,500 psi hydrostatic body test pressure for demanding well control
- Dual Ram Cavity: Independent upper and lower ram cavities accommodate pipe rams and blind rams simultaneously
- Cameron U-Type Design: Industry-standard U-type construction for reliable operation and global parts interchangeability
- NACE MR-0175 Compliant: Suitable for H2S sour service environments with appropriate material selection
- Ni-Based Alloy 625 Ring Grooves: All ring gasket grooves welded with nickel-based alloy 625 for superior corrosion and wear resistance
- Four Studded Side Outlets: 2 1/16″ 5M R24 studded outlets for choke and kill line connections, maximizing rig integration flexibility
- 42CrMo Alloy Steel Studs: Top and bottom flange studs manufactured from qualified AISI 4142 (42CrMo) alloy steel
- Complete Ram Set Included: Upper 5″ pipe ram (2 3/8″ to 5 1/2″ range) and lower blind ram assemblies included
- Hydraulic Interlocking: Dual independent hydraulic cylinders with NPT 1″ connections and ≤ 1,500 psi control pressure
- T-20 / BD Temperature Rating: Metal rated -29°C to +121°C (T-20); non-metal seals rated -18°C to +121°C (BD)
- Compact & Robust: Dimensions 82.68″ × 26.54″ × 43.42″ with easy access for maintenance and ram changes
Technical Specifications
| Item | Specification |
|---|---|
| Model | 7 1/16″ -5M WP Double Ram BOP |
| Nominal Bore | 7 1/16″ (179.4 mm) |
| Working Pressure | 5,000 psi (34.5 MPa) |
| Hydrostatic Test Pressure | 7,500 psi (51.7 MPa) |
| Top Connection | 7 1/16″ -5,000 psi R46 Flanged |
| Bottom Connection | 7 1/16″ -5,000 psi R46 Flanged |
| Side Outlets (x4) | 2 1/16″ -5,000 psi R24 Studded |
| Cylinder Diameter (Upper/Lower) | 7.25″ / 7.25″ |
| Open Hydraulic Fluid (Upper/Lower) | 1.47 gal / 1.47 gal (5.56 L each) |
| Close Hydraulic Fluid (Upper/Lower) | 1.54 gal / 1.54 gal (5.83 L each) |
| Hydraulic Control Pressure | ≤ 1,500 psi (10.3 MPa) |
| Hydraulic Connection | NPT 1″ |
| Ram Cavity Configuration | Upper: 5″ Pipe Ram (2 3/8″ – 5 1/2″); Lower: Blind Ram |
| Overall Dimensions (LxWxH) | 82.68″ x 26.54″ x 43.42″ (2,100 x 674 x 1,103 mm) |
| Net Weight | 6,746 lb (3,060 kg) |
| Design Standard | API SPEC 16A / API SPEC 16E |
| Sour Service | NACE MR-0175 Compliant |
| Temperature Rating (Metal) | T-20: -29°C to +121°C (-20°F to 250°F) |
| Temperature Rating (Non-Metal) | BD: -18°C to +121°C (0°F to 250°F) |
Material Specifications
| Component | Material |
|---|---|
| Ram BOP Body | Low Alloy Steel (Qualified Casting) |
| Intermediate Flange | Low Alloy Steel (Qualified Casting) |
| Top & Bottom Studs | AISI 4142 (42CrMo) Qualified Alloy Steel |
| Nuts | AISI C1045 (45) High Carbon Steel |
| Ring Groove Overlay | Nickel-Based Alloy 625 Stainless Steel Welding |
| Ram Bodies | Qualified Alloy Steel |
Main Components
| Component | Description |
|---|---|
| Ram BOP Body | Main pressure-containing body with dual ram cavities, four 2 1/16″ R24 studded outlets; low alloy steel casting |
| Intermediate Flange | Separates upper and lower ram cavities; low alloy steel with Ni-625 ring groove overlay |
| Upper Pipe Ram Assembly | Complete 5″ pipe ram set with elastomer seals; accommodates 2 3/8″ through 5 1/2″ tubular sizes |
| Lower Blind Ram Assembly | Complete blind ram set for full bore shut-off with certified sealing elements |
| Hydraulic Cylinders (x4) | Four 7.25″ diameter hydraulic actuating cylinders (two upper, two lower) with NPT 1″ connections |
| Bonnet Assemblies (x4) | Blind cap end covers for each cylinder; field-removable for ram maintenance |
| Top/Bottom Flanges | API R46 flanged connections with Ni-625 ring grooves and 42CrMo alloy steel studs |
| Side Outlet Studs | Four 2 1/16″ R24 studded side outlets with ring grooves for choke/kill line attachment |
Spare Parts List
| Part | Qty |
|---|---|
| Bonnet Gasket | 4 |
| Ram Shaft Seal | 4 |
| Cylinder Head O-Ring | 4 |
| Pipe Ram Top Seal | 2 |
| Blind Ram Top Seal | 2 |
| Pipe Ram Front Packer | 2 |
| Blind Ram Front Packer | 2 |
| Piston O-Ring | 4 |
| Pipe Plug NPT 1″ | 8 |
Quality Assurance & Testing
- Performance testing per API SPEC 16A requirements before delivery with certified inspection reports
- Dimensional inspection of all major components per API 16A requirements with documented records
- Mechanical property test reports for pressure-containing parts (Ram BOP Body, Intermediate Flange) and connection studs
- Chemical composition reports for all pressure-containing components and structural bolting
- NDE reports: Ultrasonic Testing (UT) and Magnetic Particle Inspection (MPI) on critical areas
- Pressure testing: Hydrostatic body test at 7,500 psi with certified test certificates
- Complete documentation: Certificates of Conformance, Material Test Reports, NDE Records, and Operation Manual (3 copies)
Applications
- Onshore and offshore drilling rigs requiring dual ram blowout prevention
- Well control with simultaneous pipe and blind ram capability
- Tripping operations with pipe ram closure on various tubular sizes
- Kill operations through 2 1/16″ side outlet choke and kill lines
- Workover and well intervention with complete shut-off capability
- Sour service (H2S) environments with NACE MR-0175 compliance
Frequently Asked Questions (FAQ)
Q1: How do I choose the right bore size and pressure rating for my Ram BOP?
Bore size should match or exceed your largest casing OD plus clearance. For most land rigs, 7 1/16″ is the standard for 4-1/2″ to 5″ drill pipe operations. Pressure rating must exceed your maximum anticipated surface pressure (MASP). The 5,000 psi (5M) working pressure is adequate for most land drilling applications. For higher pressure wells, 10M or 15M rated BOPs are recommended. Always consult your well program and casing design before selecting. CAMTOP offers a detailed Ram BOP selection guide on our website.
Q2: What types of rams can be installed in the Double Ram BOP? Can I interchange them?
The 7 1/16″ Double Ram BOP accommodates the following ram types in both upper and lower cavities:
- Pipe Rams — Seal around specific drill pipe sizes (2 3/8″ through 5 1/2″)
- Blind Rams — Complete wellbore shut-off when no pipe is in the hole
- Shear Rams — Cut through drill pipe and seal the wellbore (available as upgrade)
- Variable Bore Rams (VBR) — Seal on a range of pipe sizes with a single ram set
Yes, all ram types are interchangeable within the same cavity. Rams can be changed on the rig floor in approximately 30–60 minutes. Standard configuration ships with upper pipe rams and lower blind rams. Custom ram configurations are available upon request.
Q3: Is the CAMTOP Double Ram BOP compatible with Shaffer or Cameron BOP parts?
Yes. The CAMTOP 7 1/16″ 5M WP Double Ram BOP follows the Cameron U-type design standard. This means:
- Ram assemblies — Fully interchangeable with Cameron U-type rams
- Seal kits — Standard U-type bonnet gaskets, ram shaft seals, and piston seals
- Flange connections — API R46 flanges compatible with all standard wellhead and BOP stack components
- Side outlets — 2 1/16″ R24 studded outlets match standard choke and kill line fittings
This interchangeability significantly reduces your spare parts inventory cost and ensures you can source replacement components globally.
Q4: What is the difference between Annular BOP and Ram BOP? Do I need both?
Ram BOPs use two opposing steel rams with elastomer seals to close around specific pipe sizes or across the open hole. They provide a positive mechanical seal and are the primary well control barrier.
Annular BOPs use a doughnut-shaped rubber element that closes around any pipe size (including irregular shapes like kellys and tool joints). They are more versatile but generally have lower pressure ratings.
Most BOP stacks use both types together: an annular BOP on top for stripping and pipe movement, with ram BOPs below for primary well shut-off. The standard stack configuration is: Annular → Pipe Ram → Blind/Shear Ram. CAMTOP manufactures both types for complete BOP stack solutions.
Q5: Is this BOP suitable for H2S sour service? What about NACE compliance?
Yes. The 7 1/16″ 5M WP Double Ram BOP is fully compliant with NACE MR-0175 / ISO 15156 for sulfide stress cracking (SSC) resistance in H2S-containing environments. Key compliance measures include:
- Pressure-containing components (Ram BOP Body, Intermediate Flange) are manufactured from qualified low alloy steel with controlled hardness (max HRC 22)
- All connection studs are AISI 4142 (42CrMo) alloy steel, heat-treated to NACE requirements
- Material certifications with hardness test reports are included in the documentation package
- All elastomer seals are compatible with sour gas service
For extreme H2S concentrations or CO2 service, contact our engineering team for material upgrade recommendations.
Q6: What certifications and documentation come with the BOP?
Every CAMTOP Double Ram BOP ships with a comprehensive documentation package:
- API 16A Certificate of Conformance — Verifying design and manufacturing compliance
- Material Test Reports (MTR) — Chemical composition and mechanical properties for all pressure-containing parts
- Hardness Test Reports — Per NACE MR-0175 requirements (max HRC 22)
- NDE Reports — Ultrasonic Testing (UT) and Magnetic Particle Inspection (MPI) on critical areas
- Hydrostatic Test Certificate — Shell test at 7,500 psi with pressure chart recording
- Operation Manual — 3 copies with installation, operation, and maintenance procedures
- Spare Parts List — Complete BOM with recommended spare quantities
- Packing List and Commercial Documents — For customs clearance
All documents are traceable to the BOP serial number for your audit records.
Q7: What is the BOP testing schedule? How often should I pressure test?
Per API 16A and industry best practices (30 CFR 250.737 for offshore operations):
- Before deployment — Full hydrostatic shell test at 7,500 psi and ram function test at 5,000 psi
- Upon installation — Low-pressure (200–300 psi) and high-pressure (rated WP) test on each ram cavity
- Weekly (or per operator policy) — Function test all rams (open/close cycles)
- Every 14 days — Pressure test BOP stack per regulatory requirements
- After each well — Visual inspection, ram seal replacement if indicated
- Every 3–5 years — Complete teardown, NDE, and recertification per API 16A
Always follow your local regulatory requirements and company BOP testing policy. CAMTOP can provide testing procedures and certified recertification services upon request.
Q8: What is the delivery time and how is the BOP shipped?
Standard lead time: 8–12 weeks from order confirmation for standard configurations. Custom ram sets or material upgrades may add 2–4 weeks.
Express delivery: Available for urgent requirements at 4–6 weeks (subject to production schedule and surcharge).
Shipping: The BOP is securely packed in a welded steel frame or wooden crate with desiccant. Weight: approximately 6,746 lb (3,060 kg) for the main unit. We ship via sea freight (FCL or LCL), air freight (for urgent orders), or road transport depending on destination. CAMTOP handles all export documentation including Certificate of Origin, packing list, and commercial invoice.
Spare parts: In-stock seal kits and ram assemblies ship within 5–7 business days via DHL/FedEx/UPS.
Q9: What warranty does CAMTOP provide?
CAMTOP provides a 12-month warranty from the date of shipment (or 2,000 operating hours, whichever comes first) covering manufacturing defects in materials and workmanship. The warranty includes:
- Free replacement or repair of defective components
- Technical support for troubleshooting via phone, email, or video call
- On-site service engineer dispatch for major issues (terms apply)
Extended warranty options up to 36 months are available. The warranty does not cover normal wear items (seals, packers, ram inserts) or damage from improper operation. Full warranty terms are provided with your quotation.
Q10: Can I order a single unit or is there a minimum order quantity?
CAMTOP accepts orders from single units — there is no minimum order quantity. We serve operators of all sizes, from single-rig independent drillers to major international drilling contractors. Whether you need one Double Ram BOP, a complete BOP stack (Annular + Ram BOPs), or a full wellhead package, we can accommodate your order. Volume discounts are available for orders of 3+ units or multi-year supply agreements.
Why Choose CAMTOP?
- API SPEC 16A compliant design and manufacturing with full traceability and design verification
- ISO 9001 certified quality management system ensuring consistent product quality
- Cameron U-type interchangeable design for proven reliability and global spare parts availability
- Complete documentation package: material certificates, NDE reports, hydrostatic test records, and operation manuals
- All ring grooves welded with Ni-based Alloy 625 for long-term corrosion protection in harsh environments
- Complete ram sets included with each unit — pipe rams and blind rams ready for deployment
- Competitive factory-direct pricing with global shipping to all major oilfield regions
- Technical support including installation guidance, maintenance training, and field service assistance
Contact Us
Email: sales@cposl.com
Phone: 86-18621723891
Web: www.camtop-oilfieldtools.com
Address: No. 432, Fute North Road, Pudong District, Shanghai, China

Reviews
There are no reviews yet.