DS (Double Shear) Shearing Blind Ram for Cameron U and UM BOPs. Designed to shear drill pipe and completely seal the wellbore after shearing. Engineered for reliable performance in critical well control situations. Available for standard U/UM BOP bore sizes.
U & UM BOP DS Shearing Blind Ram | Double Shear Blind Ram Assembly
Description
U & UM BOP DS Shearing Blind Ram
The Pipe Ram is use for single or double Ram Blow Out Preventer(BOP).The ram’s size is matched with the pipe’s OD. Its can be closed between the pipe stem and well annualer space.
The Blind Ram is use for single or double Ram Blow Out Preventer(BOP). Its can be closed the well when the well without the pipe line or blowout.

| U BOP DS Shearing Blind Ram | ||||||
|---|---|---|---|---|---|---|
| BOP Bore Size and Working Pressure (psi) |
Description and Item Number | |||||
| 1* Upper Ram Subassy |
2* Body |
3* Side Packer |
4* Side Packer |
5* Blade Seal |
6* Blade Seal |
|
| 11″ 5,000 and 10,000 | 645078-01-00-04 | 645079-01-00-04 | 645080-02-00-01 | 645080-01-00-01 | 645031-02-00-01 | 645031-02-00-01 |
| BOP Bore Size and Working Pressure (psi) |
Description and Item Number | |||||
| 7* Lower Ram Subassy |
8* Body |
9* Side Packer |
10* Side Packer |
11* Top Seal (2 Required) |
||
| 11″ 5,000 and 10,000 | 645078-01-00-04 | 645079-01-00-04 | 645080-02-00-01 | 645080-01-00-01 | 644217-02-00-01 | |

Reviews
There are no reviews yet.