Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold

Choke and Kill Manifold is used to control well kick and pressure. In case of well kick or blowout, Choke Manifold may control downhole pressure by valves open/close. Heavy slurry may be pumped into well by Kill Manifold to reach pressure balance. Besides, Choke Manifold can be applied to well cleanup and blow-off.

Description

The choke and manifold is necessary device for successful control on well kick and implementation of oil and gas well pressure control technologies. It is designed, manufactured and inspected in accordance with API Spec.16C.

Choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges and other components. It is adopted to execute new drilling-well’s technique of balance pressure, which can avoid pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valve’s opening, so balanced drilling can work under minimum pressure-difference.

Kill manifold consists of check valves, gate valves, line pipes, pressure gauges. In case of increase in well head pressure, the kill manifold can provide a means of pumping heavy drilling fluid into the well to balance bottom hole pressure so that well kick and blowout can be prevented. In this case, by using blow down lines connected to the kill manifold, the increasing well head pressure also can be released directly for bottom hole pressure release. or water and extinguishing agent can be injected into the well by means of kill manifold.

Specifications:

Item Name Choke Manifold
Model JG-35 JG-35 JG-70 JG-105
Main path and Side path in(mm) 3 1/8×2 1/16(80×52) 4 1/16×2 9/16(103×65) 4 1/16×3 1/16(103×78)
Working Pressure psi (mpa) 3000(21)
5000(35)
3000(21)
10000(70)
Working Temperature ºC (°F) P.U -29~121 (-20~250)
Working medium Mud Gas(sulfur-hydrogen)
Material grade DD-FF

Item Name Kill Manifold
Model YG-35 YG-70 YG-105
Main path and Side path in(mm) 3 1/8×2 1/16(80×52) 4 1/16×2 9/16(103×65) 4 1/16×3 1/16(103×78)
Working Pressure psi(mpa) 5000(35) 10000(70) 15000(105)
Working Temperature°C(°F) P.U -29~121 (-20~250)
Working medium Mud Gas(sulfur-hydrogen)
Material grade DD-FF

 

Reviews

There are no reviews yet.

Be the first to review “Oilfield Well Frac Sand Flow-Back Choke & Kill Manifold”

Your email address will not be published. Required fields are marked *

New Courses

Contact Info

No. 432, Fute North Road, Pudong District, Shanghai, Chian

Phone: +86.21.58432768

Fax: +86.21.58432768

Web: www.camtop-oilfieldtools.com

Recent Posts