Description

 

4FZ 5 1/8″-15000 psi Quadruple Ram coiled tubing BOP

Coiled Tubing BOP used recurrently tubing try sand washing, wash well, test oil, gas lift well flowing, drainage, stuck, drilling and grinding, staged fracturing, drag the calculate words, cable operation, gas well completion, salvage fall, drilling and other operations. Coiled Tubing BOP is one of the important safety devices to prevent blowout.

Simple structure& Easy of use and fix are mainly characteristic.

Small and light, but could work under high pressure and H2S conditions.

Coiled Tubing BOP includes 5 main parts, such as Open side Saver, Lubricator, Blowout Connector, Hydraulic 4 Ram BOP and Wellhead Crossover Flange.

Feature

◆ The blind ram, shearing ram, slip ram and pipe ram are equipped inside BOP.
◆ Use the hydraulic to drive, respond rapidly.
◆ The indicating arm of ram stroke are equipped, it is convenience to show the working condition of ram.
◆ Set the manual locking, the safety factor and the reliability are high.
◆ It is applied to high pressure wellhead and H2S condition.

Main technical parameters:
1,Seal tubing diameter: 1″ ~ 3 1/2″
2,BOP and blowout preventing line diameter: 60 ~ 130mm
3,Pressure: 35 ~ 105MPa
4,Top Connection: ACME thread 5,Bottom connection: flanged, threaded, clamped.

Working Pressure

69.0MPa(10,000psi)~103.5MPa(15,000psi)

Bore

130mm(5 1/8”)

Temperature Grade

T-20

Side outlet Specification

52mm (2-1/16”)

Working Medium

Oil, mud, drilling fluid Hydrogen sulfide gas